PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Layout for Stair -3 block work Facing North.jpg Started connecting the copper piping to the 3rd floor VAV boxes Facing North.jpg Started connecting the copper piping to the 3rd floor VAV boxes Facing South.jpg VAV Boxes at the 2nd floor.jpg Welding black iron duct work at the 4th floor Facing South.jpg
Previous page Welding black iron duct work at the 4th floor Facing South
Welding black iron duct work at the 4th floor Facing South